TFTM 01-07

From IDESG Wiki
Jump to: navigation, search


Quick Links: TFTM Wiki Home | Meeting Material | TFTM Deliverables | TFTM IDEcosystem Page



NOTE: This content is DRAFT FOR DISCUSSION and has not been ratified by the TFTM Committee


Working Area for TFTM 01-07

Deliverable name: Interim Identity Ecosystem Acceptance Policy
Document Control Code: TFTM 01-07
Person Responsible: TBD
Synopsis: The policy to be used to grant use of the IDESG Trust Mark or listing service. Includes governance process definitions and structures, roles and responsibility, pricing parameters, on-boarding and approval processes. Plenary must approve.
Deliverable Audience: IDESG Plenary, to understand the nature and qualifications of the Early Adopter participants in the Interim ID Ecosystem. Assurance professionals and Early Adopter candidates, to understand obligations and requirements.
Anticipated result: The deliverable will form the basis of the Interim Trust Mark Program.
Anticipated start date: 16 October 2013 (Gaithersburg Plenary)
Anticipated delivery to TFTM date: 15 April, 2014 (IDESG Inc. start of operations)
TFTM Work Stream: TFTM-WS1: Establish an Interim ID Ecosystem Framework, Interim ID Ecosystem & Interim Trustmark Program
Contributor Names: Scott David, Tony Nadalin, Joe Grubbs, Rick O'Brien, Dave Coxe, Ian Dobson, Ann Racuya-Robbins, Dazza Greenwood.

Tentative: Bev Corwin

Collaboration method: e.g. phone, email, listserv, Plenary, F2F
TBD
Meetings and Frequency: TBD
Connections to other committees: For each Standing Committee, specify the type of connection with TFTM for this deliverable.

Standing Committees:

  • Standards: TFTM Informs
  • Privacy: TFTM Informs
  • Security: TFTM Informs
  • Policy: TFTM/Other joint work team
Filename for public version (if known): TBD
Table of Contents Link (if known): TBD