Functional Model Ad-Hoc Workgroup Work Plan Space

This wiki section will hold the Project Management-Lite artifacts, including high level schedules, work breakdowns, terms of reference for deliverables, and other work-tracking-planning material.

High Level Work Plan and Schedule

To be refined as deliverables and effort estimates are defined. Shows the streams of work in the TFTM.

Deliverables Lists

This section contains lists of potential deliverables of the TFTM. The lists should be cross-linked to the actual work spaces for the specific deliverable.

Work Breakdown Structure

A high level breakdown of the major deliverables and first level of activities required to develop them. Used to organize resource assignments and helps to elaborate the work schedule.

Functional Model

1 Develop Functional Model
1.1 Catalogue Existing Functional Models
1.2 Identify key requirements and characteristics
1.2.1 Agree on overall goals
1.2.2 Analyze NSTIC Derived Requirements
2 Communications Strategy

Deliverables Work Spaces

Spaces for each of the deliverables. The resources assigned to a deliverable can use these spaces to store works in progress and other supporting material such as meeting schedules, agendas, task lists.

Functional Model

PM Tracking Space

A space for keeping track of the work streams and deliverables progress. Intended to be extremely lightweight and used to report up to higher-order dashboards.

Work Stream Description Next Milestone Status
0 Work Plan Management Present proposed process on wiki In-progress